Home » Blog » How to Install Armstrong Lvt Flooring in Kitchen?

How to Install Armstrong Lvt Flooring in Kitchen?

Published on

By Donovan Carrington

This article provides a comprehensive guide on how to properly install Armstrong LVT flooring in a kitchen.

The installation process involves several steps, beginning with preparing the kitchen for installation and choosing the appropriate Armstrong LVT flooring.

Gathering the necessary tools and materials is essential to ensure a smooth installation process.

Accurate measurements and careful planning of the layout are crucial for achieving a professional-looking result.

Installing the subfloor and underlayment correctly is important for the stability and durability of the flooring.

Finally, the article covers the installation and finishing techniques specific to Armstrong LVT flooring.

By following these instructions, readers will gain the knowledge and skills required to successfully install Armstrong LVT flooring in their kitchen.

Preparing Your Kitchen for Installation

To ensure a smooth and successful installation of Armstrong LVT flooring in your kitchen, it is crucial to thoroughly prepare the space beforehand. Proper preparation not only ensures a durable and long-lasting installation but also maximizes the benefits of Armstrong LVT flooring.

Before installing Armstrong LVT flooring in your kitchen, it is essential to consider various kitchen flooring options. While there are numerous options available, Armstrong LVT flooring stands out due to its exceptional durability, resilience, and aesthetic appeal. Armstrong LVT flooring is designed to withstand heavy foot traffic, spills, and stains, making it an ideal choice for kitchen areas.

To prepare your kitchen for Armstrong LVT flooring installation, start by thoroughly cleaning the existing floor. Ensure that the surface is free from debris, grease, and any other contaminants that may affect the adhesion of the new flooring. It is recommended to use a high-quality floor cleaner specifically designed for the type of flooring you have.

After cleaning, inspect the subfloor for any damages or irregularities. Address any issues such as cracks, holes, or unevenness before proceeding with the installation. This step is crucial to ensure a level and stable surface for the Armstrong LVT flooring.

Lastly, measure the kitchen area accurately to determine the amount of Armstrong LVT flooring needed. Consider adding a 5-10% extra for any cuts or waste during the installation process. This will help avoid any delays or shortages of materials during the installation.

By thoroughly preparing your kitchen for Armstrong LVT flooring installation, you can ensure a smooth and successful process while maximizing the benefits of this durable and resilient flooring option.

Choosing the Right Armstrong LVT Flooring

When selecting the appropriate Armstrong Luxury Vinyl Tile (LVT) for your kitchen, it is important to consider factors such as durability, design options, and maintenance requirements.

Armstrong LVT flooring is known for its exceptional durability, making it an ideal choice for high-traffic areas like kitchens. This type of flooring is designed to withstand heavy use and is resistant to scratches, stains, and dents. With its strong wear layer and protective coating, Armstrong LVT flooring can maintain its appearance even in the busiest of kitchens.

See also  How to Install Karndean Lvt Flooring in Living Room?

In addition to its durability, Armstrong LVT flooring is also known for its low maintenance requirements. Unlike traditional hardwood or tile floors, LVT flooring does not require regular sealing or waxing. It can be easily cleaned with regular sweeping and mopping, making it a convenient option for busy homeowners.

Additionally, Armstrong offers a range of design options for their LVT flooring, allowing you to choose from a variety of colors, patterns, and textures to suit your kitchen’s aesthetic.

Overall, Armstrong LVT flooring is a durable and low-maintenance option for your kitchen. Its durability ensures that it can withstand the demands of a busy kitchen, while its easy maintenance requirements make it a practical choice for homeowners.

Consider these factors when selecting the right Armstrong LVT flooring for your kitchen installation.

Gathering the Necessary Tools and Materials

Gathering the necessary tools and materials for the installation process can be a meticulous task, requiring careful planning and organization. Before starting the installation of Armstrong LVT flooring in the kitchen, it is crucial to prepare the surfaces properly. This involves ensuring that the subfloor is clean, dry, and leveled. Any existing flooring, such as carpet or tiles, must be removed, and the subfloor should be thoroughly cleaned to remove any debris or dust.

In addition to preparing the surfaces, having the right cutting techniques and tools is essential for a successful installation. One of the primary tools needed is a utility knife with a sharp blade. This will be used to cut the LVT flooring to the desired size and shape. Additionally, a straightedge or a T-square can be used to ensure precise and straight cuts.

Other necessary tools include:

  • A measuring tape
  • A pencil
  • A notched trowel for spreading adhesive

It is important to have a knee pad or cushion to provide comfort while working on the floor for extended periods. Safety equipment such as gloves and safety glasses should also be worn to protect against any potential injuries.

By gathering the necessary tools and materials, and properly preparing the surfaces and using the appropriate cutting techniques, the installation of Armstrong LVT flooring in the kitchen can be carried out efficiently and effectively.

Measuring and Planning the Layout

Measuring and planning the layout of the space is a crucial step in the installation process of the resilient vinyl tile (LVT) in the culinary area. Properly marking and cutting the LVT planks is essential to ensure a precise fit and a seamless appearance. Before starting the installation, it is important to measure the length and width of the kitchen to determine the amount of flooring material needed.

To begin, it is recommended to remove the baseboards or trim along the walls. This will allow for a more accurate measurement and easier installation.

See also  What Is the Best Vinyl Floor Cleaner for Karndean Lvt Flooring?

Next, the kitchen floor should be thoroughly cleaned and leveled to provide a smooth surface for the LVT installation.

When marking and cutting the LVT planks, it is necessary to leave a small gap, usually around 1/8 inch, between the planks and the walls or obstacles. This gap allows for the expansion and contraction of the flooring material due to temperature and humidity changes. It is also important to consider the direction of the planks and the layout of the kitchen when marking and cutting them to achieve the desired aesthetic.

Dealing with obstacles such as cabinets and appliances during installation can be challenging. It may be necessary to cut the LVT planks to fit around these obstacles. Careful measurements and precise cutting are crucial to ensure a professional-looking installation.

Measuring and planning the layout of the space, properly marking and cutting the LVT planks, and dealing with obstacles during installation are critical steps to achieve a successful installation of Armstrong LVT flooring in the kitchen.

Installing the Subfloor and Underlayment

The first step in the installation process involves preparing the foundation of the culinary space by installing a sturdy subfloor and a suitable underlayment to provide a stable and level surface for the resilient vinyl tile.

Subfloor preparation is crucial to ensure the durability and longevity of the Armstrong LVT flooring. Before beginning the installation, it is essential to inspect the existing subfloor for any damage or irregularities. Any loose or damaged sections should be repaired or replaced to create a solid base.

After the subfloor has been inspected and repaired, an underlayment should be installed. The underlayment serves as a moisture barrier and helps to reduce noise transmission. It also provides additional support and stability to the flooring. The type of underlayment required will depend on the specific requirements of the Armstrong LVT flooring and the existing subfloor. Generally, a plywood underlayment is recommended for kitchens as it provides a strong and smooth surface.

To install the underlayment, measure and cut the sheets to fit the kitchen floor area, leaving a small gap around the edges. Secure the underlayment to the subfloor using screws or nails, ensuring that it is evenly and tightly attached. Take care to stagger the seams between the underlayment sheets to minimize any potential weak points.

By properly preparing the subfloor and installing a suitable underlayment, the foundation for the Armstrong LVT flooring in the kitchen is set, ensuring a stable and level surface for the subsequent installation steps.

Installing and Finishing the Armstrong LVT Flooring

Once the underlayment has been securely attached to the subfloor, the next step in the installation process involves carefully placing and connecting the resilient vinyl tiles to create a seamless and visually appealing surface. Installing the Armstrong LVT flooring requires attention to detail and adherence to specific guidelines to ensure a smooth installation process.

Before starting the installation, it is crucial to acclimate the LVT flooring to the room’s temperature and humidity conditions for at least 48 hours. This step helps prevent any warping or expansion of the tiles after installation. Additionally, it is essential to thoroughly clean the subfloor and remove any debris or imperfections that may affect the installation.

See also  What Is the Best Laminate Floor Cleaner for Mannington Lvt Flooring?

Begin by laying out the tiles in the desired pattern, starting from the center of the room and working towards the walls. Use a chalk line to create reference lines to guide the installation. To connect the tiles, simply align the edges and press them firmly together. It is crucial to ensure a tight fit between the tiles to avoid any gaps or inconsistencies.

Once all the tiles are in place, use a roller or a hand roller to firmly press them onto the subfloor. This step helps to bond the tiles securely and eliminates any air pockets underneath.

Finally, install transition strips or molding to provide a finished look and to protect the edges of the flooring.

Installing the Armstrong LVT flooring requires careful planning and attention to detail. By following these tips for a smooth installation process, you can achieve a visually appealing and durable flooring surface for your kitchen.

Frequently Asked Questions

How do I clean and maintain Armstrong LVT flooring in the kitchen?

To clean and maintain Armstrong LVT flooring in the kitchen, it is important to use appropriate cleaning techniques and products. Recommended cleaning products include mild detergents and non-abrasive cleaners. Regular sweeping and mopping can help maintain the flooring’s appearance and durability.

Can I install Armstrong LVT flooring over existing tile or hardwood flooring?

Installing LVT over existing tile or hardwood flooring offers several benefits. Armstrong LVT flooring is a suitable choice due to its durability and versatility. It provides a cost-effective and time-efficient solution while maintaining aesthetic appeal and long-term performance.

Are there any special considerations for installing Armstrong LVT flooring in a kitchen with underfloor heating?

Special considerations must be taken when installing Armstrong LVT flooring in a kitchen with underfloor heating. The underfloor heating installation should be compatible with the flooring, and the kitchen floor temperature should be carefully controlled to prevent any damage to the flooring.

Can I install Armstrong LVT flooring in a kitchen with a concrete subfloor?

Installing Armstrong LVT flooring on a concrete subfloor in a kitchen offers several benefits. It provides a durable and waterproof surface, easy maintenance, and a wide range of design options. Proper installation techniques should be followed for optimal results.

How long does it typically take to install Armstrong LVT flooring in a kitchen?

The average installation time for Armstrong LVT flooring in a kitchen can vary depending on factors such as the size of the space and the experience of the installer. A step-by-step installation guide can provide detailed instructions for a precise and informative installation process.

Conclusion

In conclusion, installing Armstrong LVT flooring in your kitchen requires proper preparation, the right flooring choice, and the necessary tools and materials.

Careful measurement and planning of the layout is essential for a successful installation.

Additionally, installing the subfloor and underlayment correctly will ensure a stable foundation.

Finally, the installation and finishing of the Armstrong LVT flooring will provide a durable and attractive flooring option for your kitchen.

Following these steps will result in a professional and long-lasting installation.

Previous Post

Next Post

Donovan Carrington

WRITTEN BY DONOVAN CARRINGTON

Donovan Carrington, a flooring expert with extensive experience of over 25 years, is the driving force behind Flooring Explorer. Initially working as a flooring installer, Donovan gained hands-on experience with different flooring materials such as hardwood, laminate, vinyl, and tile. His profound knowledge and expertise in flooring technologies and installation techniques have established him as a respected authority in the industry.